A and B can do a piece of work in 12 days and 36 days, respectively. Both work for 2 days and then A leaves. How long (in days) will B take to complete the remaining work?

(RRB NTPC Undergraduate CBT-1 2026 (13 Jun 2026, Shift 2))
  1. 27
  2. 30
  3. 29
  4. 28
Answer (Detailed Solution Below)
Option 4 : 28

Detailed Solution

Concept approach

LCM(12, 36) = 36 units

⇒ A = 3, B = 1

2 days = 2 × 4 = 8

⇒ left = 28

B alone = 28/1 = 28 days