A and B can do a work in 10 days and 5 days, respectively. They worked together for two days, after which B was replaced by C and the work was finished in the next three days. How long will C alone take to finish 60% of the work?

(SSC CPO 2020)
  1. 30 days
  2. 18 days
  3. 25 days
  4. 24 days
Answer (Detailed Solution Below)
Option 2 : 18 days

Detailed Solution

Concept approach

A = 10%, B = 20% per day

⇒ 2 days = 60%

⇒ remaining 40% in 3 days by A + C; A does 30%

⇒ C does 10% in 3 days

⇒ 60% in 18 days

Ultra Calci trickLCM work

LCM 10 units: A = 1, B = 2 per day. 2 days together = 6

⇒ left 4

A 3 days = 3

⇒ C does 4 − 3 = 1 in 3 days

⇒ C = 1/3 unit per day

60% = 6 units

⇒ 6 ÷ 1/3 = 18 days ✓ (30 ✗ 25 ✗ 24 ✗)