Selection KeySelection KeyFree Mock Test
View this question in:

A commercial property needs painting. 60% of the total surface area consists of walls and 40% consists of ceilings. Painter E can paint all the walls in 6 hours but would take 12 hours to paint the ceilings. Painter F can paint all the ceilings alone in 4 hours, but the walls alone would take her 18 hours. They start working simultaneously, splitting the tasks optimally based on their respective speeds. The moment either painter finishes their initial assignment, they immediately join the other to help finish the remaining surface. How long will it take them to paint the entire property?

(SSC CGL 2026 (8 Oct, Shift 1))
  1. 5.5 hrs
  2. 6 hrs
  3. 6.4 hrs
  4. 8 hrs
Answer (Detailed Solution Below)
Option 1 : 5.5 hrs

Detailed Solution

Concept approach

Total work = 100 units: walls 60, ceilings 40

E: walls 10/h, ceilings 40/12; F: ceilings 10/h, walls 60/18

⇒ E does walls, F ceilings

F finishes ceilings in 4 h; E has done 40, left 20

Together on walls: 10 + 3.33 = 13.33/h

⇒ 20/13.33 = 1.5 h

Total = 4 + 1.5 = 5.5 hrs

ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →