A and B together can do a piece of work in 20 days. A worked for 15 days and left. B finished the remaining work alone in 42 days. In how many days could B finish the whole work alone?
(SSC CPO Paper-1 2025 (11 Dec 2025, Shift 1))
- 80
- 90
- 108
- 99
Answer (Detailed Solution Below)
Option 3 : 108
Detailed Solution
Concept approach
1/A + 1/B = 1/20
⇒ 1/A = 1/20 − 1/B
A alone 15 days, then B alone 42 days: 15/A + 42/B = 1
15/20 − 15/B + 42/B = 1
⇒ 27/B = 1/4
⇒ B = 108
Ultra Calci trickmultiple-of-27 (equation subtraction)
Reading: A worked 15 days, B worked 42 days: 15A + 42B = 1 and 15(A + B) = 15/20 = 3/4
⇒ 27B = 1/4
⇒ B = 1/(27 × 4) → multiple of 27
80 ✗ 90 ✗ 99 ✗ (none ÷27) 108 ✓ (27 × 4)
⇒ 108 days
A और B मिलकर एक काम 20 दिनों में कर सकते हैं। A ने 15 दिन काम किया और छोड़ दिया। B ने शेष काम अकेले 42 दिनों में पूरा किया। 8 अकेले पूरा काम कितने दिनों में पूरा कर सकता है?
(SSC CPO Paper-1 2025 (11 Dec 2025, Shift 1))
- 80
- 90
- 108
- 99
उत्तर (विस्तृत हल नीचे)
विकल्प 3 : 108
विस्तृत हल
कॉन्सेप्ट से हल
1/A + 1/B = 1/20
⇒ 1/A = 1/20 − 1/B
A अकेला 15 दिन, फिर B अकेला 42 दिन: 15/A + 42/B = 1
15/20 − 15/B + 42/B = 1
⇒ 27/B = 1/4
⇒ B = 108
अल्ट्रा कैलसी ट्रिकmultiple-of-27 (equation subtraction)
पढ़ें: A ने 15 दिन, B ने 42 दिन काम किया: 15A + 42B = 1 और 15(A + B) = 15/20 = 3/4
⇒ 27B = 1/4
⇒ B = 1/(27 × 4) → 27 का गुणज
80 ✗ 90 ✗ 99 ✗ (27 से नहीं कटते) 108 ✓ (27 × 4)
⇒ 108 दिन