A and B together can do a piece of work in 12 days. A alone can do it in 18 days. In how many days can B alone do the work?

(SSC CGL Mains 2019 (18.11.2020))
  1. 36 days
  2. 24 days
  3. 32 days
  4. 30 days
Answer (Detailed Solution Below)
Option 1 : 36 days

Detailed Solution

Concept approach

Total = 36; A+B = 3, A = 2

⇒ B = 1

⇒ 36 days