Selection KeySelection KeyFree Mock Test
View this question in:

A, B and C can do a work in 10, 12 and 15 days respectively. All three start together, but A leaves 5 days before the completion of the work and B leaves 2 days after A. How much time is taken to do the whole work?

  1. 6
  2. 7
  3. 8
  4. 9
Answer (Detailed Solution Below)
Option 2 : 7

Detailed Solution

Concept approach

Work 60: A = 6, B = 5, C = 4. ABC = (60 + 5 × 6 + 3 × 5)/15 = 105/15 = 7 days

ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →