Selection KeySelection KeyFree Mock Test
View this question in:

An expert potter can craft a batch of pottery in 24 hours, while his apprentice can do the same in 40 hours. They receive a large high-profile order of a batch from the owner of a hotel and decide to work on it together. However, a strict quality inspector is sent by the hotel owner at the exact end of every 4-hour joint shift. The inspector rejects exactly 20% of the pottery completed during those specific 4-hour shifts due to minor imperfections. Any final remaining items needed after the last shift are crafted under direct guidance with 0% defects. How many total hours will it take them to complete the order successfully?

(SSC CGL 2026 (6 Oct, Shift 1))
  1. 18.2 hrs
  2. 17.4 hrs
  3. 16.8 hrs
  4. 15.5 hrs
Answer (Detailed Solution Below)
Option 1 : 18.2 hrs

Detailed Solution

Concept approach

LCM 120: potter 5, apprentice 3

⇒ 8 per hour

Each 4-h shift = 32, 20% rejected

⇒ net 25.6

4 shifts (16 h) = 102.4

⇒ left 17.6 at 8/h = 2.2 h

Total = 16 + 2.2 = 18.2 h

ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →