A and B can do a piece of work in 12 days and 30 days, respectively. Both work for 2 days and then A leaves. How long (in days) will B take to complete the remaining work?

(RRB NTPC Undergraduate CBT-1 2026 (15 Jun 2026, Shift 1))
  1. 22
  2. 23
  3. 24
  4. 25
Answer (Detailed Solution Below)
Option 2 : 23

Detailed Solution

Concept approach

LCM(12, 30) = 60

⇒ A = 5, B = 2

2 days = 14

⇒ left = 46

B alone = 46/2 = 23 days