Raj can do 44.44% of a work in 36 days. He works for 24 days and then Karan alone finishes the balance of the work in 38 days. In how many days will both working together complete half of the same work?

(SSC Selection Post 2026 (Higher Secondary, 18 Sep, Shift 2))
  1. 14.2 days
  2. 8.5 days
  3. 16.2 days
  4. 11.8 days
Answer (Detailed Solution Below)
Option 3 : 16.2 days

Detailed Solution

Concept approach

Raj: 4/9 in 36 days

⇒ 81 days. Done 24/81 = 8/27, Karan does 19/27 in 38 days

⇒ 54 days. Together 1/81 + 1/54 = 5/162

⇒ half = 81/5 = 16.2 days