Sonia can do 1/3rd of a work in 5 days, Tuktuk can do 2/5th of the same work in 10 days and Pamela can do 3/4th of the work in 15 days. They all start working together. After 3 days, Sonia leaves. Tuktuk and Pamela work together for another 2 days before Tuktuk leaves. Pamela then finishes the remaining work alone. For how many total days did Pamela work on the project?
- 9
- 10
- 11
- 12
Detailed Solution
Concept approach
Full work: Sonia 15 d, Tuktuk 25 d, Pamela 20 d. LCM 300: 20, 12, 15 per day
All 3 days: 47 × 3 = 141; T+P 2 days: 27 × 2 = 54
⇒ 195
Left 105 ÷ 15 = 7 days
Pamela = 3 + 2 + 7 = 12 days
Ultra Calci trickLCM work
Full work: S 15, T 25, P 20 days
⇒ LCM 300
⇒ efficiency 20, 12, 15
Day 1–3: 3 × 47 = 141; next 2 days (T + P): 2 × 27 = 54
⇒ done 195, left 105
P alone: 105/15 = 7 days
⇒ total P = 3 + 2 + 7 = 12
⇒ 12 days ✓
- 9
- 10
- 11
- 12
विस्तृत हल
कॉन्सेप्ट से हल
पूरा कार्य: सोनिया 15 दिन, टुकटुक 25 दिन, पामेला 20 दिन। LCM 300: 20, 12, 15 प्रतिदिन
तीनों 3 दिन: 47 × 3 = 141; T+P 2 दिन: 27 × 2 = 54
⇒ 195
बचा 105 ÷ 15 = 7 दिन
पामेला = 3 + 2 + 7 = 12 दिन
अल्ट्रा कैलसी ट्रिकLCM work
पूरा काम: S 15, T 25, P 20 दिन
⇒ LCM 300
⇒ दक्षता 20, 12, 15
दिन 1–3: 3 × 47 = 141; अगले 2 दिन (T + P): 2 × 27 = 54
⇒ हुआ 195, शेष 105
P अकेला: 105/15 = 7 दिन
⇒ P कुल = 3 + 2 + 7 = 12
⇒ 12 दिन ✓