Selection KeySelection KeyFree Mock Test
View this question in:

A, B and C can do a piece of work in 11 days, 20 days and 55 days respectively. How soon can the work be done if A works with B on first day, A works with C on second day and so on?

(SSC CPO Paper-1 2023 (05 Oct 2023, Shift 3))
  1. 8½ days
  2. 9½ days
  3. 8 days
  4. 9 days
Answer (Detailed Solution Below)
Option 3 : 8 days

Detailed Solution

Concept approach

Efficiency (LCM 220): A 20, B 11, C 4. Day 1: A + B = 31, day 2: A + C = 24

⇒ 55 per 2 days

⇒ 220/55 = 4 cycles = 8 days

⇒ option C.

ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →