Selection KeySelection KeyFree Mock Test
View this question in:

A can complete a piece of work in 18 days and B in 11 days. In how much time will 87% of the work be done by A and B together?

  1. 5.94 days
  2. 3.63 days
  3. 6 days
  4. 4 days
Answer (Detailed Solution Below)
Option 1 : 5.94 days

Detailed Solution

Concept approach

Together = 18 × 11/29 = 198/29 days

⇒ 0.87 × 198/29 = 0.03 × 198 = 5.94 days

Ultra Calci trickfactor and cancel

A + B per day = 1/18 + 1/11 = 29/198

⇒ time for 87% = (87/100) × 198/29

87 = 3 × 29 → the 29 cancels

⇒ 3 × 198/100 = 594/100 = 5.94

6 days ✗ (would need 600) 3.63 ✗ 4 ✗

⇒ 5.94 days ✓