A can do a piece of work in 12 days and B can do the same work in 15 days. If both do the work together, then in how many days will the work be completed?
(SSC CHSL 2023 (02 Aug 2023, Shift 4))
- 7⅔
- 6⅔
- 5⅔
- 8⅔
Answer (Detailed Solution Below)
Option 2 : 6⅔
Detailed Solution
Concept approach
Together: 12 × 15/(12+15) = 180/27 = 6 2/3 days.