12 men and 16 boys can do a piece of work in 5 days, while 13 men and 24 boys can do it in 4 days. In how many days can 29 men and 22 boys complete the work?

(SSC CGL Tier-1 2023 (17 Jul · Shift 3 · 2:30 PM))
(SSC CGL Pre 2023)
  1. 2.5
  2. 2.45
  3. 2.6
  4. 2.4
Answer (Detailed Solution Below)
Option 1 : 2.5

Detailed Solution

Concept approach

5 × (12m + 16b) = 4 × (13m + 24b)

⇒ 8m = 16b

⇒ m = 2b

⇒ work = 5 × 40b = 200b

⇒ 29m + 22b = 80b

⇒ 200/80 = 2.5 days