Three men and two women can finish a work in 120/13 days, and two men and three women in 10 days. One man and one woman start the work and after 12 days one more man joins. After three more days it is decided to finish the work on the very next day. What is the minimum number of additional men or women to be engaged?
(SSC GD 2022)
- 5 men and 10 women
- either 15 women or 9 men
- 7 men and 7 women
- either 14 women or 10 men
Answer (Detailed Solution Below)
Option 4 : either 14 women or 10 men
Detailed Solution
Concept approach
3m + 2w = 13/120, 2m + 3w = 12/120
⇒ m = 1/40, w = 1/60; work = 120
⇒ m = 3, w = 2. 12 days × 5 = 60, 3 days × 8 = 24
⇒ remaining 36 next day; present 2m + 1w = 8
⇒ extra 28
⇒ 14 women or 10 men (9 men give only 27)
तीन पुरुष और दो महिलाएँ एक काम 120/13 दिनों में, तथा दो पुरुष और तीन महिलाएँ 10 दिनों में पूरा कर सकती हैं। एक पुरुष और एक महिला काम शुरू करते हैं और 12 दिनों के बाद 1 और पुरुष जुड़ जाता है। तीन और दिनों के बाद काम अगले ही दिन पूरा करने का निर्देश दिया जाता है। न्यूनतम कितने और पुरुष या महिलाएँ लगाने होंगे?
(SSC GD 2022)
- 5 पुरुष और 10 महिलाएँ
- या तो 15 महिलाएँ या 9 पुरुष
- 7 पुरुष और 7 महिलाएँ
- या तो 14 महिलाएँ या 10 पुरुष
उत्तर (विस्तृत हल नीचे)
विकल्प 4 : या तो 14 महिलाएँ या 10 पुरुष
विस्तृत हल
कॉन्सेप्ट से हल
m = 3, w = 2, कार्य 120
⇒ 60 + 24 = 84, शेष 36; मौजूद 8
⇒ अतिरिक्त 28
⇒ 14 महिलाएँ या 10 पुरुष