Selection KeySelection KeyFree Mock Test
View this question in:

A and B can complete a job together in 12.5 days, B and C can complete the same job together in 18.75 days. C and A can complete the same job together in 15 days. In how many days will A, B and C together be able to complete the same job alongside D, who is only 40% as efficient as C?

(SSC CGL Tier-2 2023)
  1. 9 1/3
  2. 9 2/3
  3. 9 17/27
  4. 9 7/27
Answer (Detailed Solution Below)
Option 4 : 9 7/27

Detailed Solution

Concept approach

Total = 75

⇒ A+B = 6, B+C = 4, C+A = 5

⇒ C = (4 + 5 − 6)/2 = 3/2, A+B+C = 15/2 = 7.5

⇒ D = 3/2 × 2/5 = 3/5 = 0.6

⇒ A+B+C+D = 8.1

⇒ 75/8.1 = 250/27 = 9 7/27 days

Ultra Calci trickLCM work

Work = 75 units: A+B 6, B+C 4, C+A 5 → A+B+C = 15/2 = 7.5 → C = 1.5

D = 40% of 1.5 = 0.6 → all four 8.1/day

75/8.1 = 750/81 = 9 21/81

⇒ 9 7/27 ✓

ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →