9 men can do a piece of work in 21 days. The number of men required to complete the same work in 3 days is:

(RRB JE CBT-1 2024 (18 Dec 2024, Shift 3))
  1. 63
  2. 64
  3. 67
  4. 62
Answer (Detailed Solution Below)
Option 1 : 63

Detailed Solution

Concept approach

Men × days = 9 × 21 = 189

⇒ for 3 days: 189/3 = 63 men