A can do a work in 1.5 times the number of days in which B and C together can do it. If A and B together can do it in 30 days and C alone in 120 days, how many days will B take to do it alone?

(SSC CGL Pre 2023 (24.07.2023, Shift-2))
  1. 75
  2. 45
  3. 60
  4. 50
Answer (Detailed Solution Below)
Option 3 : 60

Detailed Solution

Concept approach

Work 120: A + B = 4, C = 1

⇒ A + B + C = 5; A : (B + C) = 2 : 3

⇒ A = 2, B = 2

⇒ B alone 60 days

Ultra Calci trickunits

LCM 120 → C = 1, A + B = 4 per day; let B + C = x

⇒ A = 2x/3 (A's days = 1.5 × (B + C)'s days)

2x/3 + (x − 1) = 4

⇒ 5x/3 = 5

⇒ x = 3

⇒ B = 2

120 ÷ 2 = 60 ✓

⇒ 60 days