A and B can finish a work in 6 days and 4 days, respectively. A alone worked on it for 2 days. Thereafter, B joined him. How much total time was taken by them to finish the work?
(SSC CHSL 2023 (07 Aug 2023, Shift 2))
- 3⅗ days
- 1⅗ days
- 3⅕ days
- 4⅕ days
Answer (Detailed Solution Below)
Option 1 : 3⅗ days
Detailed Solution
Concept approach
LCM(6,4) = 12 units
⇒ A = 2/day, B = 3/day
A in 2 days = 4
⇒ left 8, together 5/day
⇒ 8/5 = 1 3/5 days
Total = 2 + 1 3/5 = 3 3/5 days
ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →