A heavy machinery manufacturing plant closely monitors its factory output volume of essential car components across six consecutive working shifts. The observations are illustrated in the bar graph below: The factory operates under a strict optimization baseline target requiring exactly 80 individual components to be produced during each shift. Shorter tallies introduce a deficit, while output above 80 introduces a surplus that can mitigate existing deficits. Find the net final component deficit remaining at the end of all six shifts, expressed as a percentage of the total baseline target for all six shifts combined, rounded to two decimal places.figure

(SSC CGL 2026 (15 Oct, Shift 2))
  1. 7.66%
  2. 8.33%
  3. 9.09%
  4. 12.50%
Answer (Detailed Solution Below)
Option 2 : 8.33%

Detailed Solution

Concept approach

Total = 60+75+60+101+83+61 = 440; target = 6×80 = 480

Net deficit = 40

⇒ 40/480 = 8.33%

ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →