A can lay a railway track between two given stations in 8 days and B can do the same job in 24 days. With the help of C, they can do the job in 3 days. C alone can do the job in:

(RRB NTPC Graduate CBT-1 2025 (09 Jun 2025, Shift 1))
  1. 8 days
  2. 7 days
  3. 9 days
  4. 6 days
Answer (Detailed Solution Below)
Option 4 : 6 days

Detailed Solution

Concept approach

LCM = 24: A = 3, B = 1, (A + B + C) = 24/3 = 8

C = 8 − 4 = 4

⇒ 24/4 = 6 days

Ultra Calci trickLCM work units

LCM 24: A 3, B 1

⇒ 4 units/day; A + B + C in 3 days

⇒ 24/3 = 8 units/day

C = 8 − 4 = 4 units/day

⇒ 24/4 = 6 days (8 ✗ 7 ✗ 9 ✗)

⇒ 6 days