Selection KeySelection KeyFree Mock Test
View this question in:

A can do a certain piece of work in 2.4 times the number of days in which B and C together can do it. If A and B together can do the said piece of work in 27 days and C alone can do it in 75 days, then how many days will B take to do this piece of work alone?

(SSC CPO Paper-1 2023 (05 Oct 2023, Shift 2))
  1. 54
  2. 48
  3. 45
  4. 42
Answer (Detailed Solution Below)
Option 3 : 45

Detailed Solution

Concept approach

A : (B + C) in time = 2.4 : 1

⇒ efficiency 5 : 12

let A = 5k, B + C = 12k; C = 1/75

A + B = 17k − 1/75 = 1/27

⇒ 17k = 34/675

⇒ k = 2/675

B = 24/675 − 9/675 = 15/675 = 1/45

⇒ 45 days

ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →