A and B can do a piece of work separately in 10 days and 8 days, respectively. If they work alternately and A begins the work, in how many days will the work be completed?
(SSC Selection Post 2024 (Graduate, 26 Jun, Shift 4))
- 10
- 8
- 9
- 12
Answer (Detailed Solution Below)
Option 3 : 9
Detailed Solution
Concept approach
Total work = LCM(10, 8) = 40
⇒ A = 4/day, B = 5/day; 2-day pair = 9.
4 pairs (8 days) = 36; remaining 4 is done by A on the 9th day.
Total = 9 days.
Ultra Calci trickLCM work
LCM 40 → A = 4, B = 5 per day; 2 days (A, B) = 9
4 pairs = 8 days = 36; left 4 → A finishes on day 9
⇒ 9 days
A और B किसी कार्य को अलग-अलग क्रमशः 10 दिन और 8 दिन में कर सकते हैं। यदि वे बारी-बारी से कार्य करते हैं और A कार्य की शुरुआत करता है, तो कार्य कितने दिनों में पूरा होगा?
(SSC Selection Post 2024 (Graduate, 26 Jun, Shift 4))
- 10
- 8
- 9
- 12
उत्तर (विस्तृत हल नीचे)
विकल्प 3 : 9
विस्तृत हल
कॉन्सेप्ट से हल
कुल काम = LCM(10, 8) = 40
⇒ A = 4/दिन, B = 5/दिन; 2 दिन की जोड़ी = 9।
4 जोड़ियाँ (8 दिन) = 36; शेष 4 काम 9वें दिन A करेगा।
कुल = 9 दिन।
अल्ट्रा कैलसी ट्रिकLCM work
LCM 40 → A = 4, B = 5 प्रतिदिन; 2 दिन (A, B) = 9
4 जोड़ी = 8 दिन = 36; शेष 4 → A नौवें दिन पूरा करेगा
⇒ 9 दिन