A and B can do a piece of work separately in 10 days and 8 days, respectively. If they work alternately and A begins the work, in how many days will the work be completed?

(SSC Selection Post 2024 (Graduate, 26 Jun, Shift 4))
  1. 10
  2. 8
  3. 9
  4. 12
Answer (Detailed Solution Below)
Option 3 : 9

Detailed Solution

Concept approach

Total work = LCM(10, 8) = 40

⇒ A = 4/day, B = 5/day; 2-day pair = 9.

4 pairs (8 days) = 36; remaining 4 is done by A on the 9th day.

Total = 9 days.

Ultra Calci trickLCM work

LCM 40 → A = 4, B = 5 per day; 2 days (A, B) = 9

4 pairs = 8 days = 36; left 4 → A finishes on day 9

⇒ 9 days