A can do a piece of work in 84 hours; B and C together can do it in 42 hours, while A and C together can do it in 36 hours. How long (in hours) will B alone take to do it?

(RRB Section Controller CBT-1 2026 (12 Oct 2026, Shift 2))
  1. 126
  2. 125
  3. 128
  4. 127
Answer (Detailed Solution Below)
Option 1 : 126

Detailed Solution

Concept approach

A = 1/84; A + C = 1/36

⇒ C = 1/36 − 1/84 = 4/252 = 1/63

B = 1/42 − 1/63 = (3 − 2)/126 = 1/126

⇒ 126 hours

Ultra Calci trickLCM work/efficiency

LCM(84, 42, 36) = 252 → efficiency: A = 3, B+C = 6, A+C = 7

C = 7 − 3 = 4

⇒ B = 6 − 4 = 2

Time = 252/2 = 126 ✓ (125 ✗ 128 ✗ 127 ✗)

⇒ 126 hours