A group of men decided to do a job in 11 days but 16 men left the work after each day.
The work, as a result, got completed in 15 days. How many men were there initially in the group?
(SSC CGL Tier-1 2023 (26 Jul · Shift 1 · 9:00 AM))
- 400
- 480
- 420
- 450
Answer (Detailed Solution Below)
Option 3 : 420
Detailed Solution
Concept approach
Work = 11N man-days. Actual: N + (N − 16) + … 15 terms = 15N − 16 × (0 + 1 + … + 14) = 15N − 16 × 105 = 15N − 1680
⇒ 15N − 1680 = 11N
⇒ 4N = 1680
⇒ N = 420
⇒ option C
Ultra Calci trickfactor 105 (multiple of 7)
Work = 11N = N + (N − 16) + … (15 days) = 15N − 16 × (1 + 2 + … + 14) = 15N − 16 × 105
⇒ 4N = 16 × 105 → N = 4 × 105
⇒ multiple of 105, so of 7
400 ✗ 480 ✗ 450 ✗ (none ÷7) 420 ✓ (4 × 105)
⇒ 420
पुरुषों के एक समूह ने किसी कार्य को 11 दिन में पूरा करने का निर्णय लिया, लेकिन हर दिन के बाद 16 पुरुष कार्य छोड़ते गए। परिणामस्वरूप कार्य 15 दिन में पूरा हुआ। प्रारंभ में समूह में कितने पुरुष थे?
(SSC CGL Tier-1 2023 (26 Jul · Shift 1 · 9:00 AM))
- 400
- 480
- 420
- 450
उत्तर (विस्तृत हल नीचे)
विकल्प 3 : 420
विस्तृत हल
कॉन्सेप्ट से हल
कुल कार्य = 11N पुरुष-दिन। वास्तव में: N + (N − 16) + … 15 पद = 15N − 16 × (0 + 1 + … + 14) = 15N − 16 × 105 = 15N − 1680
⇒ 15N − 1680 = 11N
⇒ 4N = 1680
⇒ N = 420
⇒ option C
अल्ट्रा कैलसी ट्रिकfactor 105 (multiple of 7)
कार्य = 11N = N + (N − 16) + … (15 दिन) = 15N − 16 × (1 + 2 + … + 14) = 15N − 16 × 105
⇒ 4N = 16 × 105 → N = 4 × 105
⇒ 105 का गुणज, अतः 7 का
400 ✗ 480 ✗ 450 ✗ (7 से नहीं कटते) 420 ✓ (4 × 105)
⇒ 420