Selection KeySelection KeyFree Mock Test
View this question in:

A can do 20% of a work in 4 days, and B can do 33⅓% of the same work in 10 days. They worked together for 9 days and then C completed the remaining work in 6 days. B and C together will complete 75% of the same work in:

(SSC CGL Tier-1 2023 (21 Jul · Shift 3 · 2:30 PM))
  1. 12 days
  2. 9 days
  3. 11 days
  4. 10 days
Answer (Detailed Solution Below)
Option 4 : 10 days

Detailed Solution

Concept approach

A: 20 days, B: 30 days

⇒ total 60

⇒ A 3, B 2 per day

⇒ 9 days = 45

⇒ C does 15 in 6 days = 2.5/day

⇒ B + C = 4.5

⇒ 75% = 45

⇒ 45/4.5 = 10 days

Ultra Calci trickLCM work

A: 20 days, B: 30 days → LCM 120: A 6, B 4 → 9 days = 90 → C does 30 in 6 days → C = 5

B + C = 9 per day → 75% of 120 = 90 → 10 days

⇒ 10 days

ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →