Find the cost (in ₹) of digging a cuboidal pit that is 6 m long, 64 m broad and 10 m deep at the rate of ₹15 per m³.

(RRB NTPC Graduate CBT-1 2025 (14 Jun 2025, Shift 2))
  1. 57,598
  2. 57,602
  3. 57,600
  4. 57,591
Answer (Detailed Solution Below)
Option 3 : 57,600

Detailed Solution

Concept approach

Volume = 6 × 64 × 10 = 3840 m³

Cost = 3840 × 15 = ₹57,600

Ultra Calci trickending zero

Cost = 6 × 64 × 10 × 15

⇒ factor 10 (and 6 × 15 even × 5)

⇒ ends in 0

57,598 ✗ 57,602 ✗ 57,591 ✗ 57,600 ✓

⇒ ₹57,600 (check: 6 × 64 = 384 → 3840 × 15 = 57,600)