Selection KeySelection KeyFree Mock Test
View this question in:

A can complete a work in 60 days. B is 20% more efficient than A. They work together for 15 days. C alone completes the remaining work in 22.5 days. C alone will complete 5/8 part of the original work in:

(SSC (18/08/2021))
  1. 18.75 days
  2. 37.5 days
  3. 60 days
  4. 31.25 days
Answer (Detailed Solution Below)
Option 4 : 31.25 days

Detailed Solution

Concept approach

Times A : B = 60 : 50

⇒ per day 5/3 % + 2%

⇒ 15 days = 55%

⇒ C does 45% in 22.5 days

⇒ 2%/day

⇒ 5/8 = 62.5% in 31.25 days

Ultra Calci trickLCM work

B = 60/1.2 = 50 days. LCM 300: A = 5, B = 6

⇒ 15 days = 15 × 11 = 165

Left 135 in 22.5 days

⇒ C = 6/day

⇒ 5/8 of 300 = 187.5

⇒ 187.5/6 = 31.25

18.75 ✗ (< 22.5, but 62.5% > 45%) 37.5 ✗ 60 ✗

⇒ 31.25 days

ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →