A can do 1/5 of a work in 20 days, B can do 30% of the same work in 36 days, while C can do 80% of the work in 160 days. B and C together started and worked for x days. Then B left, and A joined C and both completed the remaining work in (x − 41) days. If the ratio of work done by (B + C) and by (A + C) is 19 : 6, how much of the work can C alone complete in 2x days?

(SSC CPO 2023)
  1. 6/25
  2. 57/100
  3. 13/25
  4. 19/25
Answer (Detailed Solution Below)
Option 2 : 57/100

Detailed Solution

Concept approach

A = 100, B = 120, C = 200 days

⇒ total 600: A = 6, B = 5, C = 3. 8x : 9(x − 41) = 19 : 6

⇒ 48x = 171x − 7011

⇒ x = 57. C in 114 days = 342/600 = 57/100

Ultra Calci tricktest options

A 100, B 120, C 200 days → LCM 600: A 6, B 5, C 3; C in 2x days = 3 × 2x/600 = x/100 → x = option × 100

6/25 → x = 24 ✗ (x − 41 < 0); test 8x : 9(x − 41) = 19 : 6

x = 57 → 456 : 144 = 19 : 6 ✓ (52, 76 ✗)

⇒ 57/100