Sarthak and Mohan have been assigned a work to design a room for a ceremony, Sarthak can design the entire room in 12 days, while Mohan can design the room in 15 days. In how many days will the work be completed if they work together? (Rounded off to 2 decimal places)

(SSC CGL Tier-1 2023 (17 Jul · Shift 3 · 2:30 PM))
  1. 5.67
  2. 6.67
  3. 7.33
  4. 6.00
Answer (Detailed Solution Below)
Option 2 : 6.67

Detailed Solution

Concept approach

Work 60

⇒ 5 + 4 = 9 per day

⇒ 60/9 = 6.67 days