View this question in:

A can complete a work in (x + 4) days and B takes 3 days less than A. They are joined by C whose efficiency is 25% of the combined efficiency of A and B, and then A, B and C together complete the work in 8 24/25 days. Find x.

  1. 7
  2. 6
  3. 10
  4. 20
Answer (Detailed Solution Below)
Option 4 : 20

Detailed Solution

Concept approach

ABC : AB efficiency = 5 : 4

⇒ AB time = 5/4 × 224/25 = 56/5 days

⇒ 1/(x + 4) + 1/(x + 1) = 5/56. x = 20: 1/24 + 1/21 = 15/168 = 5/56 ✓