Selection KeySelection KeyFree Mock Test
View this question in:

An e-commerce warehouse has three different models of automated sorting robots - Alpha, Beta and Gamma. The ratio of the number of Alpha robots to that of Beta robots in the warehouse is 3 : 4 and the ratio of the number of Beta robots to that of Gamma robots is 2 : 3. The individual sorting speed (parcels sorted per hour per single robot) of an Alpha, a Beta and a Gamma robot is 5 : 3 : 2. During a scheduled maintenance hour, half of the Alpha robots and one-third of the Gamma robots are sent for servicing, while all the Beta robots are totally operational. Assuming all active robots work at their exact designated sorting speeds throughout, it is found that the total number of parcels sorted by all the active Beta robots is 180 more than those sorted by all the active Alpha robots, during this maintenance hour. During a standard operational hour (when all robots of all the three types are active), what is the total number of parcels sorted by all the warehouse robots combined?

(SSC CGL 2026 (9 Oct, Shift 1))
  1. 1500
  2. 1560
  3. 1600
  4. 1650
Answer (Detailed Solution Below)
Option 2 : 1560

Detailed Solution

Concept approach

A : B = 3 : 4, B : G = 2 : 3 = 4 : 6

⇒ A : B : G = 3 : 4 : 6 (3k, 4k, 6k); speeds 5 : 3 : 2

Active: Alpha ½ × 3k × 5 = 7.5k; Beta 4k × 3 = 12k

⇒ 12k − 7.5k = 4.5k = 180

⇒ k = 40

Full hour: 15k + 12k + 12k = 39k = 39 × 40 = 1560

Ultra Calci trickunits + T1 multiple-of-13

A : B : G = 3 : 4 : 6, speeds 5 : 3 : 2 → full hour 15 + 12 + 12 = 39 units

Maintenance: B = 12, A = 15/2 = 7.5 → 4.5 units = 180 → 1 unit = 40

Total = 39 × 40 → multiple of 13: 1500 ✗ 1600 ✗ 1650 ✗

⇒ 1560

ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →