Ravi and Sanju together can do a job in 2 days, Sanju and Mahesh can do it in 4 days, while Ravi and Mahesh can do it in 2days. What is the number of days required for Ravi to do the same job alone?

(SSC CPO Paper-1 2024 (28 Jun 2024, Shift 1))
  1. 4 days
  2. 8/3 days
  3. 5/3 days
  4. 9 days
Answer (Detailed Solution Below)
Option 2 : 8/3 days

Detailed Solution

Concept approach

R + S = 1/2, S + M = 1/4, R + M = 1/2

⇒ sum = 5/4

⇒ R + S + M = 5/8.

R = 5/8 − 1/4 = 3/8 per day

⇒ 8/3 days.