इस सवाल को देखें:
Ritesh can complete a piece of work in 20 days and Genelia can complete it in 30 days. They work on alternate days starting with Ritesh on the first day. However, on every third day of the overall working schedule, it is noticed that whoever is working on that day feels fatigued and works at exactly half of their normal efficiency. How many days will it take them to complete the work?
(SSC CGL 2026 (28 Oct, Shift 2))
- 25 days
- 27.5 days
- 28.5 days
- 30 days
Answer (Detailed Solution Below)
Option 3 : 28.5 days
Detailed Solution
Concept approach
LCM 60: Ritesh 3/day, Genelia 2/day. 6-day cycle (days 3, 6 at half): 3 + 2 + 1.5 + 2 + 3 + 1 = 12.5. 4 cycles (24 days) = 50; left 10: d25 = 3, d26 = 2, d27 = 1.5, d28 = 2
⇒ 58.5; left 1.5, d29 Ritesh 3/day
⇒ 0.5 day
⇒ 28.5 days.
रितेश किसी काम को 20 दिनों में और जेनेलिया 30 दिनों में पूरा कर सकती है। वे बारी-बारी से एक-एक दिन काम करते हैं, पहले दिन रितेश से शुरू करके। लेकिन पूरी कार्य-सूची के हर तीसरे दिन, उस दिन काम करने वाला व्यक्ति थक जाता है और अपनी सामान्य दक्षता के ठीक आधे पर काम करता है। काम पूरा करने में उन्हें कितने दिन लगेंगे?
(SSC CGL 2026 (28 Oct, Shift 2))
- 25 दिन
- 27.5 दिन
- 28.5 दिन
- 30 दिन
उत्तर (विस्तृत हल नीचे)
विकल्प 3 : 28.5 दिन
विस्तृत हल
कॉन्सेप्ट से हल
LCM 60: रितेश 3/दिन, जेनेलिया 2/दिन। 6 दिन का चक्र (दिन 3, 6 आधी क्षमता): 3 + 2 + 1.5 + 2 + 3 + 1 = 12.5। 4 चक्र (24 दिन) = 50; शेष 10: d25 = 3, d26 = 2, d27 = 1.5, d28 = 2
⇒ 58.5; शेष 1.5, d29 रितेश 3/दिन
⇒ 0.5 दिन
⇒ 28.5 दिन।
ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →