A can do a work in 8 days while B alone can do it in 12 days. They work together for 4 days and the remaining work is completed by C alone in 2 days. They are paid ₹7,200 in all. The earnings of A, B and C respectively are:

(SSC MTS 18.10.2021 (Shift-2))
  1. ₹2400, ₹2400, ₹2400
  2. ₹4000, ₹2400, ₹800
  3. ₹3600, ₹2400, ₹1200
  4. ₹3000, ₹3000, ₹1200
Answer (Detailed Solution Below)
Option 3 : ₹3600, ₹2400, ₹1200

Detailed Solution

Concept approach

A = 4/8 = 1/2

⇒ 3600, B = 4/12 = 1/3

⇒ 2400, C = 1/6

⇒ 1200

Ultra Calci trickwork units

Pay ∝ work done: A 4/8 = ½, B 4/12 = ⅓, C the rest = 1/6

7200 × ½, ⅓, 1/6 = 3600, 2400, 1200

⇒ ₹3600, ₹2400, ₹1200 ✓