इस सवाल को देखें:
A can do a work in 8 days while B alone can do it in 12 days. They work together for 4 days and the remaining work is completed by C alone in 2 days. They are paid ₹7,200 in all. The earnings of A, B and C respectively are:
(SSC MTS 18.10.2021 (Shift-2))
- ₹2400, ₹2400, ₹2400
- ₹4000, ₹2400, ₹800
- ₹3600, ₹2400, ₹1200
- ₹3000, ₹3000, ₹1200
Answer (Detailed Solution Below)
Option 3 : ₹3600, ₹2400, ₹1200
Detailed Solution
Concept approach
A = 4/8 = 1/2
⇒ 3600, B = 4/12 = 1/3
⇒ 2400, C = 1/6
⇒ 1200
Ultra Calci trickwork units
Pay ∝ work done: A 4/8 = ½, B 4/12 = ⅓, C the rest = 1/6
7200 × ½, ⅓, 1/6 = 3600, 2400, 1200
⇒ ₹3600, ₹2400, ₹1200 ✓
A एक कार्य को 8 दिनों में कर सकता है जबकि B अकेला 12 दिनों में। वे 4 दिनों तक साथ कार्य करते हैं और शेष कार्य C अकेले 2 दिनों में पूरा करता है। उन्हें कुल ₹7,200 मिलते हैं। क्रमशः A, B और C की कमाई है:
(SSC MTS 18.10.2021 (Shift-2))
- ₹2400, ₹2400, ₹2400
- ₹4000, ₹2400, ₹800
- ₹3600, ₹2400, ₹1200
- ₹3000, ₹3000, ₹1200
उत्तर (विस्तृत हल नीचे)
विकल्प 3 : ₹3600, ₹2400, ₹1200
विस्तृत हल
कॉन्सेप्ट से हल
A = 1/2, B = 1/3, C = 1/6
⇒ 3600, 2400, 1200
अल्ट्रा कैलसी ट्रिकwork units
भुगतान ∝ किया गया कार्य: A 4/8 = ½, B 4/12 = ⅓, C शेष = 1/6
7200 × ½, ⅓, 1/6 = 3600, 2400, 1200
⇒ ₹3600, ₹2400, ₹1200 ✓
ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →