A and B complete a work in 24 and 30 days, respectively, working 10 hours per day.
The work is to be done in two shifts. The morning shift is for 6 hours and the evening shift is for 4 hours. On the first day, A works in the morning and B works in the evening, and they interchange their shifts every day. On which day did the work get completed?

(SSC CPO Paper-1 2023 (05 Oct 2023, Shift 1))
  1. 21st day
  2. 24th day
  3. 30th day
  4. 27th day
Answer (Detailed Solution Below)
Option 4 : 27th day

Detailed Solution

Concept approach

Work in hours: A = 240 h, B = 300 h

⇒ LCM 1200

⇒ A = 5/h, B = 4/h

odd day: A 6h + B 4h = 30 + 16 = 46; even day: B 6h + A 4h = 24 + 20 = 44

2 days = 90

⇒ 13 pairs = 26 days = 1170

left 30

⇒ done on 27th day