View this question in:
A and B complete a work in 24 and 30 days, respectively, working 10 hours per day.
The work is to be done in two shifts. The morning shift is for 6 hours and the evening shift is for 4 hours. On the first day, A works in the morning and B works in the evening, and they interchange their shifts every day. On which day did the work get completed?
(SSC CPO Paper-1 2023 (05 Oct 2023, Shift 1))
- 21st day
- 24th day
- 30th day
- 27th day
Answer (Detailed Solution Below)
Option 4 : 27th day
Detailed Solution
Concept approach
Work in hours: A = 240 h, B = 300 h
⇒ LCM 1200
⇒ A = 5/h, B = 4/h
odd day: A 6h + B 4h = 30 + 16 = 46; even day: B 6h + A 4h = 24 + 20 = 44
2 days = 90
⇒ 13 pairs = 26 days = 1170
left 30
⇒ done on 27th day
A और B प्रतिदिन 10 घंटे कार्य करते हुए एक कार्य को क्रमशः 24 और 30 दिनों में पूरा करते हैं।
कार्य दो पालियों में किया जाना है। सुबह की पाली 6 घंटे की और शाम की पाली 4 घंटे की है। पहले दिन A सुबह और B शाम को कार्य करता है, और वे प्रतिदिन अपनी पालियाँ आपस में बदल लेते हैं। कार्य किस दिन पूरा हुआ?
कार्य दो पालियों में किया जाना है। सुबह की पाली 6 घंटे की और शाम की पाली 4 घंटे की है। पहले दिन A सुबह और B शाम को कार्य करता है, और वे प्रतिदिन अपनी पालियाँ आपस में बदल लेते हैं। कार्य किस दिन पूरा हुआ?
(SSC CPO Paper-1 2023 (05 Oct 2023, Shift 1))
- 21वें दिन
- 24वें दिन
- 30वें दिन
- 27वें दिन
उत्तर (विस्तृत हल नीचे)
विकल्प 4 : 27वें दिन
विस्तृत हल
कॉन्सेप्ट से हल
घंटों में काम: A = 240 h, B = 300 h
⇒ LCM 1200
⇒ A = 5/h, B = 4/h
विषम दिन: A 6h + B 4h = 30 + 16 = 46; सम दिन: B 6h + A 4h = 24 + 20 = 44
2 दिन = 90
⇒ 13 जोड़े = 26 दिन = 1170
शेष 30
⇒ 27वें दिन पूरा
ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →