Selection KeySelection KeyFree Mock Test
View this question in:

A can do a piece of work in 32 days and B in 48 days. They work together for 8 days and then A goes away. In how much time (in days) will B finish the 60% of the remaining work?

(SSC GD Constable 2025 (04 Feb 2025, Shift 1))
  1. 19 3/4
  2. 16 4/5
  3. 17 3/7
  4. 18 2/5
Answer (Detailed Solution Below)
Option 2 : 16 4/5

Detailed Solution

Concept approach

Total = 96 units

⇒ A = 3, B = 2 per day

8 days: 5 × 8 = 40

⇒ left = 56

⇒ 60% = 33.6

B: 33.6/2 = 16.8 = 16 4/5 days

Ultra Calci trickLCM work

LCM 96: A = 3, B = 2 units/day → 8 days × 5 = 40 done, 56 left

60% of 56 = 33.6 → B: 33.6/2 = 16.8

⇒ 16 4/5 days ✓

ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →