A can do 1/3 of a work in 32 days, B can do 37.5% of it in 24 days, while C can do 60% of it in 48 days. B and C started together and worked for x days. Then B left and A joined C and both finished the remaining work in (x + 8) days. If the ratio of the work done by (B + C) to that by (A + C) is 9 : 11, how much of the work can C alone finish in 3.5x days?

(SSC CGL Tier-1 2023)
  1. 18/25
  2. 4/5
  3. 7/10
  4. 3/4
Answer (Detailed Solution Below)
Option 3 : 7/10

Detailed Solution

Concept approach

A = 96, B = 64, C = 80 days

⇒ work 960: A = 10, B = 15, C = 12. 27x : 22(x + 8) = 9 : 11

⇒ 297x = 198x + 1584

⇒ x = 16

⇒ C in 56 days = 56/80 = 7/10