Selection KeySelection KeyFree Mock Test
View this question in:

A and B can do a work in 26 2/3 days. B and C together can complete the same work in 48 days, while A and C together can complete the same work in 30 days. How long (in days) will A alone take to complete 60% of the work?

(SSC CGL Mains 29.01.2022)
  1. 20
  2. 32
  3. 24
  4. 36
Answer (Detailed Solution Below)
Option 3 : 24

Detailed Solution

Concept approach

Total = 240; A+B = 9, B+C = 5, A+C = 8

⇒ A+B+C = 11

⇒ A = 6

⇒ 40 days; 60%

⇒ 24 days

Ultra Calci trickLCM work

A + B = 80/3 days; LCM 240 → A + B = 9, B + C = 5, A + C = 8 per day

Sum of all three = 22/2 = 11 → A = 11 − 5 = 6 → A alone = 240/6 = 40 days

60% of the work = 0.6 × 40 = 24

⇒ 20 ✗ 32 ✗ 36 ✗

⇒ 24 ✓

ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →