A and B can do a piece of work in 12 days and 39 days, respectively. Both work for 4 days and then A leaves. How long (in days) will B take to complete the remaining work?

(RRB NTPC Undergraduate CBT-1 2026 (08 May 2026, Shift 3))
  1. 24
  2. 21
  3. 23
  4. 22
Answer (Detailed Solution Below)
Option 4 : 22

Detailed Solution

Concept approach

LCM = 156: A = 13, B = 4

4 days = 68

⇒ remaining 88

B alone = 88/4 = 22 days

Ultra Calci trickLCM work

LCM 156 → A 13, B 4 → 4 days = 68 → left 88

B: 88/4 = 22 days

⇒ 22