A alone can do a work in 11 days, B alone in 22 days and C alone in 33 days. They work in the following manner — Day 1: A and B work; Day 2: B and C work; Day 3: C and A work; Day 4: A and B work, and so on. In how many days will the work be completed?

(SSC CGL 2021 Tier-II (08.08.2022))
  1. 9 days
  2. 12 days
  3. 3 days
  4. 6 days
Answer (Detailed Solution Below)
Option 1 : 9 days

Detailed Solution

Concept approach

Total = 66; A 6, B 3, C 2. 3-day cycle = 9 + 5 + 8 = 22

⇒ 3 cycles = 66

⇒ 9 days

Ultra Calci trickLCM work

LCM 66 → A = 6, B = 3, C = 2 per day

Day 1: A + B = 9, Day 2: B + C = 5, Day 3: C + A = 8 → 3 days = 22

66 ÷ 22 = 3 cycles

⇒ 9 days