The pie chart shows the cost of construction of a house in degree .
What is the average expenditure on timber, super vision and cement?
(SSC CHSL 2023 (04 Aug 2023, Shift 4))
- 20%
- 21%
- 10%
- 15%
Answer (Detailed Solution Below)
Option 4 : 15%
Detailed Solution
Concept approach
Timber 36°, supervision 54°, cement 72°
⇒ average = 162/3 = 54°
54/360 × 100 = 15%.
ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →