Working together, A and B can do a certain work in 45 days. They work together for 10 days. They complete the remaining work in 28 days with the assistance of C. The work done by C in 3 days is equal to the work done by B in 2 days. A and C together can complete 70% of the original work in:
(ICAR (2 Mar 2022))
- 30 days
- 36 days
- 40 days
- 35 days
Answer (Detailed Solution Below)
Option 2 : 36 days
Detailed Solution
Concept approach
(A+B)·35 = (A+B+C)·28
⇒ A+B : A+B+C = 4 : 5
⇒ A+B = 4, C = 1, B = 1.5 (2B = 3C), A = 2.5; work = 4 × 45 = 180
⇒ A+C = 3.5
⇒ 70% = 126
⇒ 126/3.5 = 36 days
Ultra Calci trickLCM work / efficiency
A + B = 45 days
⇒ LCM 360: A + B = 8/day; 10 days = 80
⇒ 280 left in 28 days
⇒ A + B + C = 10/day
⇒ C = 2
C × 3 = B × 2
⇒ B = 3
⇒ A = 5
⇒ A + C = 7/day
70% of 360 = 252
⇒ 252/7 = 36 days
A और B एक साथ कार्य करने पर एक निश्चित कार्य को 45 दिनों में पूर्ण कर सकते हैं। उन्होंने 10 दिनों तक एक साथ कार्य किया। शेष कार्य को उन्होंने C की सहायता से 28 दिनों में पूर्ण किया। C द्वारा 3 दिनों में किया गया कार्य, B द्वारा 2 दिनों में किए गए कार्य के बराबर है। A और C एक साथ मिलकर मूल कार्य का 70% भाग कितने दिनों में पूरा कर सकते हैं?
(ICAR (2 Mar 2022))
- 30 दिन
- 36 दिन
- 40 दिन
- 35 दिन
उत्तर (विस्तृत हल नीचे)
विकल्प 2 : 36 दिन
विस्तृत हल
कॉन्सेप्ट से हल
(A+B)·35 = (A+B+C)·28
⇒ A+B = 4, C = 1, B = 1.5, A = 2.5; कार्य = 180
⇒ 126/3.5 = 36 दिन
अल्ट्रा कैलसी ट्रिकLCM work / efficiency
A + B = 45 दिन
⇒ LCM 360: A + B = 8/दिन; 10 दिन = 80
⇒ 28 दिन में 280 शेष
⇒ A + B + C = 10/दिन
⇒ C = 2
C × 3 = B × 2
⇒ B = 3
⇒ A = 5
⇒ A + C = 7/दिन
360 का 70% = 252
⇒ 252/7 = 36 दिन
ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →