A can do a piece of work in 18 days. B can do the same work in 9 days. How much more work does B do than A in 1 day?
1

(SSC Selection Post 2026 (Matric, 16 Sep, Shift 3))
  1. 1/18
  2. 1/12
  3. 1/9
  4. 2/9
Answer (Detailed Solution Below)
Option 1 : 1/18

Detailed Solution

Concept approach

B − A = 1/9 − 1/18 = 2/18 − 1/18 = 1/18