If 20% of a certain quantity of work is done by A and the rest 80% by B, the work is completed in 20 days. If 80% of the work is done by A and the remaining 20% by B, then the work is completed in 32 days. How many days are required to complete the work if A works alone?

  1. 10
  2. 24
  3. 36
  4. 16
Answer (Detailed Solution Below)
Option 3 : 36

Detailed Solution

Concept approach

(80% A + 20% B) − (20% A + 80% B) = 60% (A − B) = 32 − 20 = 12 days

⇒ A − B (100%) = 20 days. Adding both: 100% A + 100% B = 52 days

⇒ A = (52 + 20)/2 = 36 days