A and B can do a piece of work in 15 days, while B and C can do the same work in 12 days, and C and A in 10 days. They all work together for 5 days, and then B and C leave. How many days more will A take to finish the work?

(SSC MTS 2021 (22 Oct 2021, Shift 1))
  1. 12
  2. 4
  3. 15
  4. 9
Answer (Detailed Solution Below)
Option 4 : 9

Detailed Solution

Concept approach

Total work 60: A+B = 4, B+C = 5, C+A = 6

⇒ A+B+C = 7.5

⇒ A = 2.5, B+C = 5

5 days: 7.5 × 5 = 37.5

⇒ left 22.5

⇒ 22.5/2.5 = 9 days

⇒ option D

Ultra Calci trickLCM work

LCM 60 → A + B = 4, B + C = 5, C + A = 6 → all = 7.5 → A = 2.5

5 days = 37.5 → left 22.5 → A: 22.5/2.5 = 9 days

⇒ 9