A, B and C can complete a work in 10, 20 and 40 days respectively. A works on the first day, B on the second day, C on the third day, A again on the fourth day and so on. In how many days will the work be completed?

  1. 15 days
  2. 16.5 days
  3. 15.5 days
  4. 17 days
Answer (Detailed Solution Below)
Option 2 : 16.5 days

Detailed Solution

Concept approach

Total = 40: A = 4, B = 2, C = 1

⇒ cycle of 3 days = 7

⇒ 15 days = 35; day 16 A: 39; B needs 1/2 day

⇒ 16.5 days

Ultra Calci trickLCM work

LCM 40 → A 4, B 2, C 1 → 3 days = 7

5 cycles (15 days) = 35; day 16 A → 39; B needs 1 of 2 → ½ day

15 ✗ 15.5 ✗ 17 ✗

⇒ 16.5 days