इस सवाल को देखें:
A can complete a certain work alone in 10 days, while B can complete the same work in 5 days. They work together for 2 days, after which B leaves and C joins A. A and C then complete the remaining work in 3 days. Find the number of days C would take to complete 40% of the work if working alone.
(SSC CGL 2026 (6 Oct, Shift 2))
- 8 days
- 10 days
- 12 days
- 16 days
Answer (Detailed Solution Below)
Option 3 : 12 days
Detailed Solution
Concept approach
LCM 10: A = 1, B = 2 per day. Together 2 days = 6
⇒ left 4
A + C do 4 in 3 days
⇒ 4/3 per day
⇒ C = 1/3 per day
C alone: 30 days
⇒ 40% work = 12 days
Ultra Calci trickLCM work / efficiency
Total work = LCM(10, 5) × 3 = 30 units
⇒ A = 3, B = 6 per day
2 days (A+B) = 2 × 9 = 18
⇒ left 12 in 3 days
⇒ A + C = 4
⇒ C = 1 per day
40% of 30 = 12 units
⇒ 12 ÷ 1 = 12 days ✓
A किसी काम को अकेले 10 दिनों में पूरा कर सकता है, जबकि B वही काम 5 दिनों में पूरा कर सकता है। वे 2 दिन साथ काम करते हैं, फिर B चला जाता है और C, A के साथ जुड़ जाता है। A और C शेष काम 3 दिनों में पूरा करते हैं। C अकेले काम करते हुए 40% काम कितने दिनों में पूरा करेगा?
(SSC CGL 2026 (6 Oct, Shift 2))
- 8 दिन
- 10 दिन
- 12 दिन
- 16 दिन
उत्तर (विस्तृत हल नीचे)
विकल्प 3 : 12 दिन
विस्तृत हल
कॉन्सेप्ट से हल
LCM 10: A = 1, B = 2 प्रतिदिन। साथ 2 दिन = 6
⇒ बचा 4
A + C ने 3 दिन में 4
⇒ 4/3 प्रतिदिन
⇒ C = 1/3 प्रतिदिन
C अकेला: 30 दिन
⇒ 40% कार्य = 12 दिन
अल्ट्रा कैलसी ट्रिकLCM work / efficiency
कुल काम = 30 इकाई (10 और 5 का LCM × 3)
⇒ A = 3, B = 6 प्रतिदिन
2 दिन (A+B) = 2 × 9 = 18
⇒ शेष 12, 3 दिन में
⇒ A + C = 4
⇒ C = 1 प्रतिदिन
30 का 40% = 12 इकाई
⇒ 12 ÷ 1 = 12 दिन ✓
ऐसे ही सवालों के असली परीक्षा जैसे मॉक टेस्ट — मुफ़्तStart free test →