View this question in:
A, B and C can do a work separately in 18, 36 and 54 days, respectively. They started the work together, but B and C left 5 days and 10 days, respectively, before the completion of the work. In how many days was the work finished?
(SSC CGL Mains 2019 (18 Nov 2020))
- 12 days
- 13 days
- 15 days
- 14 days
Answer (Detailed Solution Below)
Option 2 : 13 days
Detailed Solution
Concept approach
LCM 108: A = 6, B = 3, C = 2 per day; total days T
6T + 3(T − 5) + 2(T − 10) = 108
⇒ 11T = 143
⇒ T = 13 days
Ultra Calci trickLCM work
LCM 108: A = 6, B = 3, C = 2 per day; T = total days → B works T − 5, C works T − 10
6T + 3(T − 5) + 2(T − 10) = 108 → 11T = 143 → T = 13 (143 = 11 × 13)
12 ✗ 15 ✗ 14 ✗
⇒ 13 days ✓
A, B और C अलग-अलग किसी कार्य को क्रमशः 18, 36 और 54 दिनों में कर सकते हैं। उन्होंने एक साथ कार्य शुरू किया, लेकिन B और C ने कार्य पूरा होने से क्रमशः 5 दिन और 10 दिन पहले कार्य छोड़ दिया। कार्य कितने दिनों में समाप्त हुआ?
(SSC CGL Mains 2019 (18 Nov 2020))
- 12 दिन
- 13 दिन
- 15 दिन
- 14 दिन
उत्तर (विस्तृत हल नीचे)
विकल्प 2 : 13 दिन
विस्तृत हल
कॉन्सेप्ट से हल
LCM 108: A = 6, B = 3, C = 2 प्रति दिन; कुल दिन T
6T + 3(T − 5) + 2(T − 10) = 108
⇒ 11T = 143
⇒ T = 13 दिन
अल्ट्रा कैलसी ट्रिकLCM work
LCM 108: A = 6, B = 3, C = 2 प्रतिदिन; कुल दिन T → B: T − 5, C: T − 10 दिन
6T + 3(T − 5) + 2(T − 10) = 108 → 11T = 143 → T = 13 (143 = 11 × 13)
12 ✗ 15 ✗ 14 ✗
⇒ 13 दिन ✓